Including.. led nav lights at the bow and associated cabling tidied, anchor winch wiring tidied and new circuit breaker installed, new cabin radio fitted, lots more surplus wires removed, nav instruments now sharing data over seatalkng and nmea 2k which are now linked, spare main and jib stowed in bow.
I still have a lot to do but I’m really starting to feel I’m getting on top of things and I can see light at the end of the tunnel.
I went for a walk with my daughter and grandsons yesterday which was a welcome break. I have about two weeks left to get the boat ready to sail. I am starting to look for an alternative and cheaper mooring for next month onward.