Apart from a two day break to return to New Quay, I have continued the boat rewire this week. Lots more old wires are out, the Bilge pumps nearly sorted (see below), nav and deck lights wired to the panels, all instruments are now in the new panel and radar and GPS powered and working. There is still a lot to do, including linking the instruments for data sharing.
The second hand bilge pump is out but I need to wait for a new hose to simplify the sink waste. The new automatic bilge pump is in but it has a sticky float switch, I can only use it manually at the moment. I may get a seperate float switch to resolve this.